Panel Upgrade Timeline: What Austin Homeowners Can Expect from Start to Finish

Upgrading your electrical panel is one of the smartest investments you can make in your Austin home. Whether you’re adding a new EV charger, remodeling your kitchen, or simply noticing your breakers tripping too often, a panel upgrade ensures your home’s electrical system can handle modern demands safely and efficiently. But what exactly does the process look like from start to finish? Let’s walk through the timeline so you’ll know what to expect.

Step 1: Initial Consultation and Assessment

The first step begins with an in-home evaluation by a licensed electrician. During this visit, our team will:

  • Inspect your current panel for age, condition, and capacity.

  • Discuss your electrical usage, upgrades, or new appliances you plan to add.

  • Identify any code compliance issues.

  • Provide a clear estimate and project scope.

This step typically takes 1–2 hours and ensures that we create a tailored plan for your specific needs.

Step 2: Permits and Scheduling

Electrical panel upgrades require permits in Austin to comply with city safety codes. Once you approve the estimate, we handle the permitting process. This stage can take anywhere from a few days to two weeks, depending on city workload. After permits are secured, we’ll schedule your installation at a convenient time for you.

Step 3: Preparing for Installation

On installation day, our electricians arrive with all the necessary equipment and materials. Before work begins:

  • Power will be shut off to your home.

  • Sensitive electronics may be unplugged or protected.

  • Safety checks are performed to ensure a smooth upgrade.

Step 4: Removing the Old Panel

The existing electrical panel and breakers are carefully removed. This includes disconnecting circuits and inspecting wiring for any damage. This stage usually takes 1–2 hours depending on panel condition.

Step 5: Installing the New Panel

Here’s where the upgrade takes shape:

  • The new panel is mounted and securely fastened.

  • Breakers and wiring are connected to align with your home’s electrical load.

  • Proper grounding is established for safety.

This portion of the process can take 3–6 hours, depending on the complexity of your system.

Step 6: Inspection and Approval

Once installation is complete, the city inspector reviews the work to ensure it meets Austin electrical codes. Our electricians remain on-site to address any questions. This inspection is typically scheduled the same day or within 1–2 business days.

Step 7: Final Testing and Power Restoration

After the inspection is approved, we restore power to your home. We’ll test circuits, confirm that everything is operating correctly, and walk you through the new panel so you feel confident using it.

Step 8: Peace of Mind for Years to Come

From consultation to final approval, a panel upgrade typically takes 1–2 weeks total, with just a single day of actual on-site installation. Once complete, you’ll enjoy the benefits of:

  • Increased safety and reduced fire risk.

  • Reliable power for modern appliances and EV chargers.

  • Compliance with Austin building and electrical codes.

  • Added value to your home.


Ready to Upgrade Your Panel?

If your home’s electrical system is struggling to keep up, Austin Aztec Electric is here to help. With decades of experience serving homeowners across Central Texas, our licensed electricians provide safe, efficient, and code-compliant upgrades from start to finish.

Call us today to schedule your panel assessment and take the first step toward a safer, more reliable home.

Experience the Aztec Electric Difference

Join thousands of satisfied Austin customers who trust us with their electrical needs. Get your free estimate today.

CONTACT US TODAY
AZTEC ELECTRIC •
QUALITY ELECTRICAL SERVICES
InstagramPinterestFacebookEmail